BMS Videos

Bryce Anderson Bryce Anderson

BMS/BAS Distributed power and controls

We are building buildings faster than ever before, but we haven’t changed how we design and install the BMS/BAS. To keep up we need to completely change how we design and install BMS/BAS systems.

Read More
Bryce Anderson Bryce Anderson

Our BMS graphics suck - part 1

Graphics are the easiest thing to enhance to impress our customers. But, we continue to deliver the most simple graphics.

Read More
Bryce Anderson Bryce Anderson

Simple PID adjustment that saves energy

When we want to save energy, we often start with the major systems. E.g., the chilled water system. But, there are a lot of small changes that can be made, which can often be done during BMS service time.

Read More
Bryce Anderson Bryce Anderson

Where did all the BMS people go?

They were here, and now they are not. I thought I’d sit down and try to work this one out as no one has given me a good answer yet.

Read More
Bryce Anderson Bryce Anderson

BMS Net Zero - Measurement and Verification

The BMS Net Zero program. Know exactly how you are going to test your optimisation efforts and how you are going to prove the reduced power consumption before you start. If you can not prove the saving, then there is no saving!

Read More
Bryce Anderson Bryce Anderson

BMS Net Zero - Where to Start

The BMS Net Zero program. Which systems you start optimising is important. If you do not start with the right system, you may need to come back later and do it again.

Read More
Bryce Anderson Bryce Anderson

BMS Net Zero - Introduction

We do not need millions of electric cars, millions of wind turbines, millions of solar panels, billions of dollars - we just need time to update the software programs in millions of existing BMS controllers. And, we can do this during normal service time. We already have a maintenance contract, we are already getting paid to go to site. Why not update the code while we are there?

Read More
Bryce Anderson Bryce Anderson

What are we going to GIVE AWAY next?

Five years ago we gave away building Analytics, ten years ago we gave away Energy Management Systems. What are we going to give away in the next five years?

Read More
Bryce Anderson Bryce Anderson

Covid is causing Outside Air Control Issues

After thought: When the health department talks about buildings that do not have enough outside air, they are probably talking about hotels, age care living, apartments, C-Grade buildings with DX air conditioning. I don't think this lack of outside air applies to premium grade and A-Grade buildings in expensive cities around the world, built in the past 10 years. They are often designed with lots of outside air (above code requirements).

Read More
Bryce Anderson Bryce Anderson

Why does BMS Instrumentation FAIL?

In this video we are introducing a couple of things for you to think about that may cause BMS equipment to prematurely fail. Can we make our BMS equipment last longer? Go study in depth the entire control loop from the sensor, through the controller to the output device. Read all the datasheets for every component, including the installation instructions. Go look at the cable.

Read More
Bryce Anderson Bryce Anderson

How Important is it to YOU that Your Projects make Money?

This is video is for the Building Management System engineers that think they do not need to worry about Project Management. At the end of the day, project management is more important than design and engineering. Believe me, I have been there and felt the pain.

Read More
Bryce Anderson Bryce Anderson

The Mechanical Consultants BMS Design

This video wraps up the 3 part series on better understanding the BMS design from a mechanical consultants point of view. If you want to be a better BMS designer or project manager, then you need to understand the constraints of the mechanical consultant.

Read More
Bryce Anderson Bryce Anderson

Do You Understand Your Design & Construct Responsibility?

A lot of the things we blame the mechanical consultant for in the BMS industry, are actually our responsibility, and not their responsibility. This video starts a 3 part series into better understand our BMS issues, from a mechanical consultants point of view. Hopefully better understanding why these issues exist will help you to mitigate the issue and reduce the impact on your deliverables.

Read More
Bryce Anderson Bryce Anderson

BMS & Fire Mode

Even when a hardwired smoke control system is provided, it is easy for the BMS to cause significant issues. BMS engineers are often not aware that their software code is potentially affecting the life safety system. This is an important video, not just for BMS companies, but anyone that needs the fire and smoke control system to work during a fire.

Read More
Bryce Anderson Bryce Anderson

Value = Optimisation + Graphics

In this video we are continuing our discussion about improving Building Management System graphics. Graphics that you need to build as part of a longer-term energy efficiency program. If you work in the BMS service department, then you are best placed to start working this into your normal day-to-day maintenance tasks.

Read More
Bryce Anderson Bryce Anderson

BMS Home Page Graphic - Link Buttons Only?

When you design the BMS graphics, do you ever think about what the Facility Manager needs? The home page is the first graphic that is presented when someone logs in. You could almost say it is the most important page - make a good first impression.

Read More
Bryce Anderson Bryce Anderson

We Are Destroying The Building Management System Industry

We have a track record for leaving the door open for new emerging technologies to takeover parts of our industry, one piece at a time. We are at a crossroads right now, we either pickup our game or continue to squabble between ourselves as we continue to give away more and more of our industry to the next wave of hungry technology providers. We gave up energy management and analytics, we gave up chiller management systems, are we going to keep doing this?

Read More
Bryce Anderson Bryce Anderson

Energy Management System Visualisation

Remember that discussion we had, "we are destroying the BMS industry", here is another example where we stop just short of providing high value and end up opening the door to 3rd party technology providers.

Read More
Bryce Anderson Bryce Anderson

HLI Commissioning ISSUES

Following on from a previous HLI control video, this video discusses a significant gap being introduced with the supply of packaged control systems. Consultants, mechanical contractors and Building Management Systems companies, we all need to play a part in providing an end-to-end working solution.

Read More
Bryce Anderson Bryce Anderson

IP Ratings and Weatherproofing (BMS)

Just because you bought an IP65 sensor, it doesn't mean it's 100% weatherproof.

This week we discuss a few things to consider when you are designing your Building Management System instrumentation and installation.

Read More
Bryce Anderson Bryce Anderson

Early BMS Commissioning

Now that we have distributed our controllers and started install a couple of months early, how can we start commissioning before permanent power is available?

Read More
Bryce Anderson Bryce Anderson

BMS Distributed Controls

This 3rd video in the series discusses distributed controls as we move towards reducing our reliance on the mechanical board.

Read More
Bryce Anderson Bryce Anderson

Mechanical Board Bottleneck

This week we are talking through why the mechanical board is such a bottleneck in the installation and commissioning of a Building Management System.

Read More
Bryce Anderson Bryce Anderson

Modern BMS Maintenance

In this third and final video in the series we look at a few other ideas to explore as you transition into a new modern way to maintain Building Management Systems.

Read More
Chilled water system Bryce Anderson Chilled water system Bryce Anderson

Chiller Minimum Flow Control

This is the first in a series of 3 videos discussing chiller minimum flow control. Chillers occasionally tripping on low water flow is an issue I come across on most primary only pumps systems. This video focuses on explaining why the primary pump modulates to control system pressure and not the minimum flow through the chiller.

Read More
Bryce Anderson Bryce Anderson

BMS Witnessing

It always surprises me how BMS companies will achieve almost impossible milestones during a twelve month challenging project and then just show up to BMS witnessing without a plan.

Read More
Bryce Anderson Bryce Anderson

Risk - Design & Construct

Do you ever wonder how contractors get away with being non-compliant to the consultant’s specification?

Read More
Bryce Anderson Bryce Anderson

Risk Mitigation - Intro

Why are we surprised every time the commissioning program gets compressed? Don't be surprised, it's going to happen. Put in place a risk mitigation plan and do something about it.

Read More
CO2 Control Bryce Anderson CO2 Control Bryce Anderson

CO2 Control - Demand Control Ventilation

CO2 Control is one of the Building Management System control strategies that is most often incorrectly implemented. 
The purpose of Demand Control Ventilation is to reduce outside air and save energy and not to provide additional outside to improve Indoor Air Quality over the original mechanical design. 

Read More
Bryce Anderson Bryce Anderson

We need to change how we specify and procure the BMS

50 years ago, building control systems consisted of relays, thermostats, time clocks and pneumatics. It made sense for mechanical engineers to scope and specify the control system as a subsection of the mechanical specification. 

Read More
Bryce Anderson Bryce Anderson

Does your BMS need to be upgraded?

There are a variety of issues that can trigger the requirement for a Building Management System upgrade. Here are some examples to help you decide.

Read More
Bryce Anderson Bryce Anderson

How can we install and commission the BMS faster?

The days of practical completion dates being pushed back to allow for Building Management Systems to be properly commissioned are over. In this article we will discuss an alternative delivery method that should allow installation to start earlier and create some breathing room between commissioning and practical completion.

Read More